Monday, August 2, 2010

Floor build days 3 & 4

Kyle driving screws into the double rim joist.

Day 3 will be used to add the 3 remaining piers, installing the double rim joist and insulating the floor.

Jake getting in on the action.


Once the rim joist are finished the insulating begins!



Mom and Jake hard at work.


Once the insulation was in we layed down some poly and called in a day, 10 hours in the sun and 85 degrees.
Off to the lake for a swim and a bath.

Day four started at 5 am due to weather concerns.
Get the plywood screwed down and stain the frame.

Dad and Kyle getting started.



finishing up the screws



We added a coat of stain as a protective layer on the exposed GT frame.


Jake and Kyle doing some staining down under.



Jake and Kyle on the finished deck.

The work accomplished on day 3 and 4 would not have been possible without my wife and two boys giving 100%.
Thanks Carol and Boys.